Maintenance Schedule
Quality Control Checkpoints
Section titled “Quality Control Checkpoints”Use these measurements to verify your build is within acceptable limits.
| Checkpoint | When | Acceptable | Action if Exceeded |
|---|---|---|---|
| Post plumb | After setting | ≤ 10mm over 3m | Re-seat post; add wedges at base |
| Roof center gap | After tower removal | Tips within 20mm | Add compression ring; adjust wire |
| Post settlement | Years 1, 3, 5 | ≤ 15mm total | Investigate drainage; shim |
| Wire lashing | Annual | No slack; sings when plucked | Re-tension or replace |
| Pole moisture | Before assembly | ≤ 20% (pin meter) | Continue drying; do not install |
| Interior humidity | Winter occupancy | ≤ 65% sustained | Increase ventilation; dehumidifier |

Seasonal Tasks
Section titled “Seasonal Tasks”Spring (March-May)
Section titled “Spring (March-May)”- Full structural inspection (use tolerance table above)
- Check all spike connections for loosening
- Repair winter damage to render
- Plant natives in restoration areas
Summer (June-August)
Section titled “Summer (June-August)”- Maximum fire vigilance
- Maintain defensible space weekly
- Water living roof if extended drought
- Monitor fire danger daily
Autumn (September-November)
Section titled “Autumn (September-November)”- Apply limewash touch-ups
- Clean gutters and water system
- Prepare for wet season
- Assess restoration progress
Winter (December-February)
Section titled “Winter (December-February)”- Monitor for leaks
- Check drainage function
- Plan next year’s improvements
- Document ecosystem recovery